Engineering surveys

 

2019 Reconstruction of the unfinished construction object “National Scientific and Practical Center of neurotrauma and neurorehabilitation” as part of the State Institution “Institute of Neurosurgery named after academician Romodanov of the National Academy of Medical Sciences of Ukraine”, Kiev
2018 New energy source construction based on Caterpillar cogeneration plant at mine shaft «Stepnaya», 2-nd unit, Pershotravneva Street, 1д, Nikolaevka Village, Petropavlovsk District, Dnepropetrovsk Region, Ukraine
2018 Construction of a hydrocarbon preparation facility Lyutnyansky GR (site number 3 gas metering), Lviv region, Ukraine
2018 Building of ground for the collection and storage of waste companies in s. Strizhevka, Zhitomir region, Ukraine
2018 Reconstruction of OTL 220 кV ‘Stryi-Borislav’, Lviv region, Ukraine
2019-2018 Ukrgazdobycha. Engineering surveys in Poltava, Dnepropetrovsk, Kharkov regions, Ukraine
2018 Lvivgazdobycha, sites for the construction of wells, Lviv region, Ukraine
2018 Severodonetskaya power plant. Reconstruction of heat supply system, Lugansk region, Ukraine
2017 OTL 6 and 10 kV, Poltava region, Ukraine
2017 Reconstruction of sewage collector d300 mm at Zaporizhzhia city, Ukraine
2017 OTL 35 kV – approach line at Substation 110 kV Kotlyarevskaya, Donetsk region, Ukraine
2017 Reconstruction of combined heat and power plant with installation of a turbo-generator 4 MW at CHAO ‘EVRAZ DMZ’, Dnepr city, Ukraine
2017 Sites for the construction of 30 wells at Shebelinkagazdobycha, Kharkov region, Ukraine
2017 Intraquarter heat networks, Dnepr city, Ukraine
2016 PAO ‘DTEK Dneproblenergo’. OHL and Cable line 6 and 10 kV at Dnepropetrovsk region, Ukraine
2016 Severodonetsk Association AZOT. Cogeneration plant for generating electric power and process steam with power 2х12,9 MW. Donetsk region, Ukraine
2016 Reconstruction of existing electrolysis plants at Kiev Cogeneration plant-5, Ukraine
2015 Building of Substation 150 kV ‘Naddnepryanskaya’ with Cable line 150 kV, Dnepr city, Ukraine
2015 Substation 330 kV Lebedi ОАО ‘Lebedinskiy GOK’, Gubkin city, Belgorod region, Russia
2015 Heat-recovery boiler of reactor-regenerative unit GК-3 production unit 11 NPZ OAO ‘Angarsk petrochemical company’. Irkutsk region, Russia
2015 Building of external water supply and water removal networks at Yakutskaya Regional power station-2 Sakha Republic (Yakutiya), Russia
2015 Building of CCGT-cogeneration plant 230 MW at Rybinsk city, Yaroslavl region, Russia
2014 Working project for building of sludge collector N2 on the territory of Kremenchug cogeneration plant, Poltava region, Ukraine
2014 Technical re-equipment of 35 kV outdoor switchgear and 6 kV indoor switchgear at substation 35 kV “KKHP”, Volnovakha city, Donetsk city, Ukraine
2014 Technical re-equipment of 35 kV outdoor switchgear at substation 35 kV ‘Stashkova’, Dnepropetrovsk region, Ukraine
2014 Technical re-equipment of 35 kV outdoor switchgear and 10 kV indoor switchgear at substation 35 kV ‘Yakovlevka’, Donetsk region, Ukraine
2014 Technical re-equipment of 35 kV outdoor switchgear at substation ‘Kommunist’, Khartsyzsk, Donetsk region, Ukraine
2014 Technical re-equipment of 6 kV indoor switchgear at substation 110 kV ‘Chulkovka’. Donetsk city, Ukraine
2013 Technical re-equipment of substation 110 kV ‘Zuevka’, Donetsk region, Ukraine
2013 Alternate replacement of power transformers Т-1 and Т-2 at substation Druzhkovka-110 kV, Donetsk region, Ukraine
2013 Substation 110 kV ‘Ugolno-Rtutnaya’. Technical re-equipment, Gorlovka city, Donetsk region, Ukraine
2013 Substation 35 kV ‘OCHS’. Technical re-equipment, Gorlovka city, Donetsk region, Ukraine
2013 Building of Substation 220/110/10 kV ‘Peleduy’. Sakha Republic (Yakutiya), Russia
2013 Building of double circuit OHL 220 kV Gorodskaya-Peleduy. Sakha Republic (Yakutiya), Russia
2013 Approach line of OHL 110 kV at substation 500/220/110 kV Svyatogor. Tyumen region, Russia
2013 PAO ‘DTEK Dneproenergo’ DTEK Krivoy Rog power station. Technical re-equipment of power unit st.№1 power of 325 MW, Zelenodolsk city, Dnepropetrovsk region, Ukraine
2013 Technical re-equipment of power unit st. №3 Zaporozhe power station power of 320 MW, Energodar city, Zaporozhe region, Ukraine
2013 Optimization of the heat supply system at Ivanovo city. Transfer of heat load of Ivanovskaya cogeneration plant-1 and Ivanovskaya cogeneration plant-2 to Ivanovskaya cogeneration plant-3. Russia
2012 Reconstruction of auxiliary power station of Yagel LPU MG. Yamal-Nenets Autonomous District, Tyumen region, Russia
2012 Reconstruction of auxiliary power station of Sosnovsk LPU MG. Khanty-Mansiyskiy region, Yugra, Tyumen region, Russia
2012 Reconstruction of auxiliary power station of Komsomolsk LPU MG (КС-20). Khanty-Mansiyskiy region, Yugra, Tyumen region, Russia
2012 Substation 110 kV Povarovo, OAO ‘MOESK’, Moscow region, Russia

Reports about our surveyors by Construction director Yuriy Nikolaevich Smirnov and director of OOO ‘TOK-Stroy’ Sergey Bladimirovich Belonin: