CCGT cogeneration plant-200 MW at Syzran cogeneration plant

 

CCGT Cogeneration plant-200 is located at the territory of Syzran combined heat and power plant (branch of ОАО ‘Volga Territorial Generation Company’), now – ‘T?Plus’ KES- holding) at Syzran city Samara region.

CCGT equipment:

  • two gas turbine units PG6111FA “General Electric” with power 75 MW each;
    steam turbine SST-600 “Siemens” with power 74,4 MW;
  • two steam heat recovery boilers КУ-110/15-8,2/0,69-544/227, 129 t/h.

Rated electrical power of steam gas heating unit under environmental conditions of Syzran city is 225,8 MW.

Heat power of steam turbine selection:
– industrial – 50 t/h;
– heating – 138 Gcal/h.

 

Annual output of energy:
– electric – 1229 mln. kW•h
– heat – 705 ths. Gcal.

Operating mode – semi-peak. Number of hours of rated power usage – 5700.

 

The project was carried out using 3D modeling programs of the company AVEVA.

In 2012, CCGT was put into operation.

Head of strategic projects in Russia and CIS countries General Electric Andrei Petrovich Dudko particularly noted in his response that the institute ‘performs an integrated design of heat power stations – develops all sections of the project.’