CCGT 30 MW at Livny cogeneration plant

CCGT-30 MW at Livny cogeneration plant, Livny city, Orel region, Russia.


Main equipment:

  • gas turbine unit LM2500+G4 “General Electric”;
  • steam heat recovery boiler КУП-45-3,9-440.

Feature of the work: implementation of air cooling due to the limited recycled water supply.

CCGT-30 MW at Livny cogeneration plant was put into operation in 2013.

Deputy General Director on Capital Construction TGK-4 Aleksandr Anatolevich Umrikhin noted that the specialists of the Institute showed ‘good equipment and possession of computer equipment and software’.